The answer depends on several factors, including the scope of work, material availability, contractor scheduling, and permit approvals. While minor updates can take 2–3 weeks, a full bathroom remodel may require 6–8 weeks or more, especially if it involves layout changes or structural work.
Understanding the timeline helps you plan efficiently, minimize disruptions, and set realistic expectations for your remodel.
🔹 Cosmetic Updates (2–3 Weeks) – Includes replacing fixtures, repainting, or swapping out a vanity.
🔹 Standard Remodel (4–6 Weeks) – Involves new flooring, cabinetry, and plumbing fixture upgrades.
🔹 Full Remodel (6–8+ Weeks) – Requires layout changes, structural modifications, and custom materials.
A full-scale renovation, especially as part of a whole home remodel or home addition, takes longer because of the multiple trades involved.
🔹 In-stock materials (tiles, vanities, fixtures) keep projects moving.
🔹 Custom orders (cabinetry, stone countertops, imported tiles) may add 2–6 weeks to the timeline.
🔹 If plumbing or structural changes are involved, city permits and inspections can extend the process.
🔹 Each municipality has different approval times—Ottawa typically requires 1–3 weeks for permit processing.
🔹 Electricians, plumbers, tilers, and painters need to work in sequence.
🔹 Design build remodel teams help streamline this by managing all trades under one contract.
While each renovation is unique, here’s a general timeframe for different bathroom remodel types:
✔️ Painting, new fixtures, and retiling
✔️ No plumbing or layout changes
✔️ Vanity and countertop upgrades
✔️ Flooring and tiling replacement
✔️ New lighting and improved ventilation
✔️ Complete layout reconfiguration
✔️ Walk-in shower or freestanding tub installation
✔️ Custom cabinetry and high-end materials
✔️ New plumbing, walls, and ventilation installation
✔️ Electrical, waterproofing, and tiling
✔️ Final fixtures, painting, and finishing work
A bathroom remodel that’s part of a custom build or whole home remodel may take longer due to the coordination of multiple rooms being worked on simultaneously.
🚀 Plan Ahead: Secure all materials before starting construction to prevent supply chain delays.
🚀 Work with a Design Build Remodel Team: One team managing the entire project speeds up completion.
🚀 Stick to Your Original Design: Frequent changes cause rework and extend timelines.
🚀 Ensure Permits Are Submitted Early: Waiting on approvals can push your project back by weeks.
The timeline for a bathroom renovation in Ottawa varies depending on the size, complexity, and scope of work. Small updates can be done in 2–3 weeks, while a full remodel typically takes 6–8 weeks. A bathroom addition or structural changes may extend beyond 8–12 weeks.
To ensure an efficient renovation, hiring an experienced design build remodel team helps streamline planning, material selection, and construction.
📞 Contact Terzetto Homes today for a consultation and expert guidance on your bathroom remodel!
Join our mailing list to receive info on our latest projects, home design trends, fresh ideas, helpful tips and inspiration!
Terzetto Homes
50 Colonnade Rd. North
Unit# 200B, Nepean, ON K2E 7J6
1637 West 3rd Ave, Vancouver, B.C. V6J 1K1
Phone Number: 613-226-6886
[email protected]
© 2021 Terzetto Homes. All Rights Reserved. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Website Design By: Hanna Lictawa & Bigredtruck